- No elements found. Consider changing the search query.
āļāļąāļāļĐāļ°:
Assembly, Procurement, Quality Assurance
āļāļĢāļ°āđāļ āļāļāļēāļ:
āļāļēāļāļāļĢāļ°āļāļģ
āđāļāļīāļāđāļāļ·āļāļ:
āļŠāļēāļĄāļēāļĢāļāļāđāļāļĢāļāļāđāļāđ
- Mechanical design of fiber-optic pump packages and components.
- Mechanical design of fixture/tooling and equipment for fiber-optic component manufacturing.
- Generate conceptual design, layout, prototyping, bill of materials, piece part and assembly drawings.
- Working closely with optical, process and device engineers for design optimization and NPI (New Production Introduction).
- Interact with vendors for piece parts specification, procurement, and quality assurance.
- Select vendors and complete first article qualification.
- Perform component qualification and generate reports.
- Document engineering reports, engineering drawings, and equipment design specifications.
- We are an equal opportunity employer and value diversity at our company. We do not discriminate on the basis of race, religion, color, national origin, sex, gender, gender expression, sexual orientation, age, marital status, veteran status, or disability status. We will ensure that individuals with disabilities are provided reasonable accommodation to participate in the job application or interview process, to perform essential job functions, and to receive other benefits and privileges of employment. Please contact us to request accommodation.
āļāļĢāļ°āļŠāļāļāļēāļĢāļāđ:
5 āļāļĩāļāļķāđāļāđāļ
āļāļąāļāļĐāļ°:
Electrical Engineering, Industrial Engineering, Mechanical Engineering
āļāļĢāļ°āđāļ āļāļāļēāļ:
āļāļēāļāļāļĢāļ°āļāļģ
āđāļāļīāļāđāļāļ·āļāļ:
āļŋ20,000 - āļŋ30,000
- āļ§āļēāļāđāļāļāđāļĨāļ°āļāļģāđāļāļīāļāļāļēāļĢāļāļģāļĢāļļāļāļĢāļąāļāļĐāļēāđāļāļīāļāļāđāļāļāļāļąāļ (Preventive Maintenance) āļāļąāļāļāļģāđāļāļāđāļĨāļ°āļāļ§āļāļāļļāļĄāļāļēāļĢāļāļģāļĢāļļāļāļĢāļąāļāļĐāļēāđāļāļĢāļ·āđāļāļāļāļąāļāļĢāđāļāđāļĨāļāđāļāļēāļĢāļāļĨāļīāļāļāļąāļāđāļāļĄāļąāļāļī āđāļāđāļ āļĢāļ°āļāļāļŠāļēāļĒāļāļēāļāļĨāļģāđāļĨāļĩāļĒāļ (Conveyor), āđāļāļĢāļ·āđāļāļāļāļĢāļĢāļāļļ (Packaging Machine), āđāļāļĢāļ·āđāļāļāļāļŠāļĄ (Mixer), āđāļĨāļ°āļŦāļļāđāļāļĒāļāļāđ (Robotics) āđāļāļ·āđāļāļĨāļāļāļēāļĢāđāļŠāļĩāļĒāđāļ§āļĨāļēāđāļāļāļēāļĢāļāļĨāļīāļ (Downtime).
- āđāļāđāđāļāđāļĨāļ°āļāđāļāļĄāļāļģāļĢāļļāļāđāļāļĢāļ·āđāļāļāļāļąāļāļĢ (Corrective Maintenance) āļ§āļīāđāļāļĢāļēāļ°āļŦāđāļŠāļēāđāļŦāļāļļāđāļĨāļ°āđāļāđāđāļāļāļąāļāļŦāļēāđāļāļĢāļ·āđāļāļāļāļąāļāļĢāļāļĩāđāļāļąāļāļāđāļāļāļāļĒāđāļēāļāļĢāļ§āļāđāļĢāđāļ§āđāļĨāļ°āļĄāļĩāļāļĢāļ°āļŠāļīāļāļāļīāļ āļēāļ āđāļāļ·āđāļāđāļŦāđāđāļĨāļāđāļāļēāļĢāļāļĨāļīāļāļāļĨāļąāļāļĄāļēāļāļģāļāļēāļāđāļāđāļāļēāļĄāļāļāļāļīāđāļāļĒāđāļĢāđāļ§āļāļĩāđāļŠāļļāļ.
- āļāļĢāļąāļāļāļĢāļļāļāđāļĨāļ°āļāļąāļāļāļēāļāļĢāļ°āļāļ§āļāļāļēāļĢ (Process Improvement) āļĄāļāļāļŦāļēāđāļāļāļēāļŠāđāļāļāļēāļĢāļāļĢāļąāļāļāļĢāļļāļāļāļĢāļ°āļŠāļīāļāļāļīāļ āļēāļāļāļāļāđāļāļĢāļ·āđāļāļāļāļąāļāļĢāđāļĨāļ°āļāļĢāļ°āļāļ§āļāļāļēāļĢāļāļĨāļīāļ āđāļāļ·āđāļāđāļāļīāđāļĄāļāļ§āļēāļĄāļāđāļēāđāļāļ·āđāļāļāļ·āļ (Reliability) āđāļĨāļ°āļĨāļāļāđāļāļāļļāļāļāļēāļĢāļāļĨāļīāļ.
- āļāļđāđāļĨāļĢāļ°āļāļāļŠāļāļąāļāļŠāļāļļāļāļāļēāļĢāļāļĨāļīāļ āļĢāļąāļāļāļīāļāļāļāļāļāļđāđāļĨāļĢāļ°āļāļāļāļĩāđāđāļāļĩāđāļĒāļ§āļāđāļāļ āđāļāđāļ āļĢāļ°āļāļāļĨāļĄāļāļąāļ (Compressed Air), āļĢāļ°āļāļāđāļāļāđāļģ (Steam), āđāļĨāļ°āļĢāļ°āļāļāļāđāļģāļŦāļĨāđāļāđāļĒāđāļ (Chilling System).
- āļāļąāļāļāļģāđāļāļāļŠāļēāļĢāđāļĨāļ°āļĢāļēāļĒāļāļēāļ āļāļąāļāļāļģāļĢāļēāļĒāļāļēāļāļāļēāļĢāļāđāļāļĄāļāļģāļĢāļļāļ, āļāļĢāļ°āļ§āļąāļāļīāđāļāļĢāļ·āđāļāļāļāļąāļāļĢ, āđāļĨāļ°āđāļāļāļŠāļēāļĢāļāļĩāđāđāļāļĩāđāļĒāļ§āļāđāļāļāļāļēāļĄāļĢāļ°āļāļāļāļļāļāļ āļēāļ āđāļāđāļ GMP, HACCP.
- āļāļĢāļīāļāļāļēāļāļĢāļĩ āļŠāļēāļāļēāļ§āļīāļĻāļ§āļāļĢāļĢāļĄāđāļāļĢāļ·āđāļāļāļāļĨ āļŦāļĢāļ·āļāļŠāļēāļāļēāļāļĩāđāđāļāļĩāđāļĒāļ§āļāđāļāļ.
- āļĄāļĩāļāļĢāļ°āļŠāļāļāļēāļĢāļāđāļāđāļēāļāļāļēāļĢāļāđāļāļĄāļāļģāļĢāļļāļāđāļāđāļĢāļāļāļēāļāļāļļāļāļŠāļēāļŦāļāļĢāļĢāļĄāļāļĒāđāļēāļāļāđāļāļĒ 2-3 āļāļĩ.
- āļŦāļēāļāļĄāļĩāļāļĢāļ°āļŠāļāļāļēāļĢāļāđāđāļāļāļļāļāļŠāļēāļŦāļāļĢāļĢāļĄāļāļēāļŦāļēāļĢ āļŦāļĢāļ·āļāđāļĢāļāļāļēāļāļāļĩāđāļĄāļĩāđāļĨāļāđāļāļēāļĢāļāļĨāļīāļāļāļąāļāđāļāļĄāļąāļāļīāļāļ°āđāļāđāļĢāļąāļāļāļēāļĢāļāļīāļāļēāļĢāļāļēāđāļāđāļāļāļīāđāļĻāļĐ.
- āļĄāļĩāļāļ§āļēāļĄāļĢāļđāđāļāļ§āļēāļĄāđāļāđāļēāđāļāđāļāļĢāļ°āļāļāđāļāļĢāļ·āđāļāļāļāļĨ, āļāļīāļ§āđāļĄāļāļīāļāļŠāđ (Pneumatics), āđāļĨāļ°āđāļŪāļāļĢāļāļĨāļīāļāļŠāđ (Hydraulics) āđāļāđāļāļāļĒāđāļēāļāļāļĩ.
- āļĄāļĩāļāļ§āļēāļĄāđāļāđāļēāđāļāđāļāļĢāļ°āļāļāļĄāļēāļāļĢāļāļēāļāļāļļāļāļ āļēāļāđāļĨāļ°āļāļ§āļēāļĄāļāļĨāļāļāļ āļąāļĒāđāļāļāļļāļāļŠāļēāļŦāļāļĢāļĢāļĄāļāļēāļŦāļēāļĢ (GMP, HACCP) āļāļ°āđāļāđāļāļāļĢāļ°āđāļĒāļāļāđ.
- āļŠāļēāļĄāļēāļĢāļāļāđāļēāļāđāļāļāđāļāļĢāļ·āđāļāļāļāļĨ (Mechanical Drawing) āđāļĨāļ°āļāļđāđāļĄāļ·āļāļāļēāļĢāđāļāđāļāļēāļāđāļāđ.
āļāļąāļāļĐāļ°:
Business Development, Procurement, Civil Engineering
āļāļĢāļ°āđāļ āļāļāļēāļ:
āļāļēāļāļāļĢāļ°āļāļģ
āđāļāļīāļāđāļāļ·āļāļ:
āļŠāļēāļĄāļēāļĢāļāļāđāļāļĢāļāļāđāļāđ
- Engineering role in business development, project development, and project execution phases from inception to commercial operation.
- Performing technical feasibility study, technical due diligence study, and preparing technical inputs/proposals for business development of projects.
- Conceptual design and operation philosophy of the Hydro Power Plant.
- Pre-construction development of the projects: Defining scope and specification of work, in order to procure engineering, procurement, and/or construction works, and biding and evaluating for engineering, procurement, and/or construction works.
- Execution phase of the projects: Reviewing hydro-mechanical engineering documents, and reviewing, coordinating, controlling, and following up works with contractors in order to ensure that the engineering, procurement and construction works are in accordance with the project specification, on time and on budget, in accordance with the objective of the project.
- Coordinating with team and providing supports on relevant issues in order to complete project effectively..
- Job QualificationsBachelor s degree in Mechanical Engineering or a related field..
- Minimum 5-10 years of experience in mega infrastructure or construction projects (experience in renewable energy projects is a plus but not mandatory)..
- Strong knowledge of civil engineering principles, construction methodologies, and site management.
- Strong leadership, problem-solving, and cross-cultural communication skills.
- Professional Engineering (PE) license or equivalent is a plus.
- Be able to work permanently outside of Thailand for an international project.
- Fluent in English both written and verbal (Minimum 750 TOEIC score).
- Goal-Oriented, Unity, Learning, Flexible.
āļāļĢāļ°āļŠāļāļāļēāļĢāļāđ:
5 āļāļĩāļāļķāđāļāđāļ
āļāļąāļāļĐāļ°:
Procurement, Mechanical Engineering, English
āļāļĢāļ°āđāļ āļāļāļēāļ:
āļāļēāļāļāļĢāļ°āļāļģ
āđāļāļīāļāđāļāļ·āļāļ:
āļŠāļēāļĄāļēāļĢāļāļāđāļāļĢāļāļāđāļāđ
- Perform reliability testing. Write test reports and provide analysis of the test data,.
- prepare documentation and recommendations..
- Familiar with test equipment such as HALT and Environmental chambers, Power.
- supplies, DMMs, Data loggers, ThermocouplesIR cameras, Oscilloscopes etc..
- Lead meetings with customers to update the Reliability activities status.
- Work with the cross-functional team to ensure the products can meet the design specification and reliability goals..
- Conduct failure analysis (FA). Ensure that the Reliability issues have been resolved in the prompt and timely manner..
- Direct and coordinate engineering activities concerned with development, procurement, Installation, maintenance and calibration of instruments, equipment, and control devices required to test, record, and reduce test data..
- May provide training in new procedures to testing staff or technicians..
- Perform moderately complex assignments of the engineering test function.
- Knowledge/Skills/Competencies.
- Ability to read schematics..
- Knowledge of product and component failure modes and mechanisms..
- Effective communication skills and can do attitude..
- Good verbal and written communication skills in English.
- Typical Experience.
- Minimum 5 years working experience in hands-on testing of electronic products (Communication, Enterprise products, etc.).
- Typical Education.
- BS in Electrical or Mechanical engineering or related field.
- Notes.
- This job description is not intended to be an exhaustive list of all duties and responsibilities of the position. Employees are held accountable for all duties of the job. Job duties and the % of time identified for any function are subject to change at any time.
- Celestica is an equal opportunity employer. All qualified applicants will receive consideration for employment and will not be discriminated against on any protected status (including race, religion, national origin, gender, sexual orientation, age, marital status, veteran or disability status or other characteristics protected by law).
- At Celestica we are committed to fostering an inclusive, accessible environment, where all employees and customers feel valued, respected and supported. Special arrangements can be made for candidates who need it throughout the hiring process. Please indicate your needs and we will work with you to meet them.
- Celestica (NYSE, TSX: CLS) enables the world s best brands. Through our recognized customer-centric approach, we partner with leading companies in Aerospace and Defense, Communications, Enterprise, HealthTech, Industrial, Capital Equipment and Energy to deliver solutions for their most complex challenges. As a leader in design, manufacturing, hardware platform and supply chain solutions, Celestica brings global expertise and insight at every stage of product development - from drawing board to full-scale production and after-market services for products from advanced medical devices, to highly engineered aviation systems, to next-generation hardware platform solutions for the Cloud. Headquartered in Toronto, with talented teams spanning 40+ locations in 13 countries across the Americas, Europe and Asia, we imagine, develop and deliver a better future with our customers.
- Celestica would like to thank all applicants, however, only qualified applicants will be contacted.
- Celestica does not accept unsolicited resumes from recruitment agencies or fee based recruitment services.
āļāļĢāļ°āļŠāļāļāļēāļĢāļāđ:
āđāļĄāđāļāļģāđāļāđāļāļāđāļāļāļĄāļĩāļāļĢāļ°āļŠāļāļāļēāļĢāļāđāļāļģāļāļēāļ
āļāļąāļāļĐāļ°:
English
āļāļĢāļ°āđāļ āļāļāļēāļ:
āļāļēāļāļāļĢāļ°āļāļģ
āđāļāļīāļāđāļāļ·āļāļ:
āļŋ15,000 - āļŋ22,000, āļĄāļĩāļāđāļēāļāļāļĄāļĄāļīāļāļāļąāđāļ
- āđāļŦāđāļāļēāļĢāļŠāļāļąāļāļŠāļāļļāļāļāļēāļāđāļāļāļāļīāļāđāļāđāļĨāļđāļāļāđāļēāđāļĨāļ°āļāļĩāļĄāļāļēāļāļ āļēāļĒāđāļ.
- āđāļāđāđāļāļāļąāļāļŦāļēāļāļĩāđāđāļāļĩāđāļĒāļ§āļāđāļāļāļāļąāļāļĢāļ°āļāļ POS āđāļĨāļ°āļāļēāļĢāļāđāļāļĄāļāļļāļāļāļĢāļāđ.
- āļāļĢāļ°āļŠāļēāļāļāļēāļāļāļąāļāđāļāļāļāļāļ·āđāļāđ āđāļāļ·āđāļāđāļŦāđāļĨāļđāļāļāđāļēāļāļķāļāļāļāđāļ.
- āļāļąāļāļāļģāļāļąāļāļāļķāļāļāļģāļāļāļĢāļąāļāļāļĢāļīāļāļēāļĢāđāļĨāļ°āđāļāļ§āļāļēāļāđāļāđāđāļāļāļąāļāļŦāļēāļāļĒāđāļēāļāļĨāļ°āđāļāļĩāļĒāļ.
- āļ§āļļāļāļīāļāļēāļĢāļĻāļķāļāļĐāļēāļĢāļ°āļāļąāļāļāļāļļāļāļĢāļīāļāļāļēāļŦāļĢāļ·āļāļāļĢāļīāļāļāļēāļāļĢāļĩ āļŠāļēāļāļēāđāļāļāļĩ āļŦāļĢāļ·āļāļŠāļēāļāļēāļāļĩāđāđāļāļĩāđāļĒāļ§āļāđāļāļ.
- āļĄāļĩāļāļąāļāļĐāļ°āļāļēāļĢāđāļāđāļāļąāļāļŦāļē āļāļēāļĢāļāļąāļāļāļēāļĢ āđāļĨāļ°āļāļēāļĢāļāļģāļāļēāļāļŦāļĨāļēāļĒāļāļĒāđāļēāļāļāļĢāđāļāļĄāļāļąāļāđāļāđāļāļĩ.
- āļĄāļĩāļāļ§āļēāļĄāļĢāļđāđāđāļāļĩāđāļĒāļ§āļāļąāļāļĢāļ°āļāļ POS āļŦāļĢāļ·āļāđāļāļāđāļāđāļĨāļĒāļĩāđāļāļāļĩāļāļ°āļāļīāļāļēāļĢāļāļēāđāļāđāļāļāļīāđāļĻāļĐ.
- āļŠāļēāļĄāļēāļĢāļāđāļāđāđāļāļĢāđāļāļĢāļĄ Microsoft Office (Excel, Word, PowerPoint) āđāļāđāļāļĒāđāļēāļāļāļĨāđāļāļāđāļāļĨāđāļ§.
- āļĄāļĩāļāļąāļāļĐāļ°āļāļēāļĢāļŠāļ·āđāļāļŠāļēāļĢāđāļĨāļ°āļĄāļāļļāļĐāļĒāđāļŠāļąāļĄāļāļąāļāļāđāļāļĩāđāļāļĩ.
- āļĄāļĩāļĢāļāļāļąāļāļĢāļĒāļēāļāļĒāļāļāđāđāļĨāļ°āđāļāļāļąāļāļāļĩāđ.
- āļĒāļīāļāļāļĩāļĢāļąāļāļāļąāļāļĻāļķāļāļĐāļēāļāļāđāļŦāļĄāđ.
- āļāļģāđāļĄāļāđāļāļāļŠāļĄāļąāļāļĢāļāļēāļāļāļąāļāđāļĢāļē?.
- āļĢāđāļ§āļĄāļāļēāļāļāļąāļ Office Design āđāļāļ·āđāļāđāļāđāļāļŠāđāļ§āļāļŦāļāļķāđāļāļāļāļāļāļĩāļĄāļāļĩāđāļĄāļļāđāļāļĄāļąāđāļāļŠāļĢāđāļēāļāļŠāļĢāļĢāļāđāđāļāļĨāļđāļāļąāļāļāļĩāđāļāđāļ§āļĒāđāļŦāđāļāļļāļĢāļāļīāļāđāļāļīāļāđāļ āļāļĢāđāļāļĄāđāļāļāļēāļŠāđāļāļāļēāļĢāļāļąāļāļāļēāļāļąāļāļĐāļ°āđāļĨāļ°āđāļāļīāļāđāļāđāļāļŠāļēāļĒāļāļēāļāļĩāļāđāļāļŠāļ āļēāļāđāļ§āļāļĨāđāļāļĄāļāļēāļĢāļāļģāļāļēāļāļāļĩāđāļŠāļĢāđāļēāļāļŠāļĢāļĢāļāđāđāļĨāļ°āđāļāđāļāļĄāļīāļāļĢ.
- 1
āļĒāļāļāļāļīāļĒāļĄ
āļĨāļāļāļāļģ 5 āļŠāļīāđāļāļāļĩāđāļŦāļĨāļąāļāđāļĨāļīāļāļāļēāļ āļāļĩāļ§āļīāļāļāļļāļāļāļ°āđāļāļĨāļĩāđāļĒāļāđāļāļāļĨāļāļāļāļēāļĨ
āļāļģāđāļāļ°āļāļģāļāđāļēāļāļāļēāļāļĩāļāļāļĢāļīāļĐāļąāļ 7 āđāļāļāļāļĩāđāļāļļāļāđāļĄāđāļāļ§āļĢāļāļģāļāļēāļāļāđāļ§āļĒ
āļāļģāđāļāļ°āļāļģāļāļēāļĢāļŦāļēāļāļēāļāđāļāļīāļāđāļāļĨāļŠāļļāļāļĒāļāļ 50 āļāļĢāļīāļĐāļąāļāļāļĩāđāļāļāļĢāļļāđāļāđāļŦāļĄāđāļāļĒāļēāļāļĢāđāļ§āļĄāļāļēāļāļāđāļ§āļĒāļĄāļēāļāļāļĩāđāļŠāļļāļ 2025
āļāđāļēāļ§āļŠāļēāļĢāđāļŦāļĄāđāđ
